11. How does Springboard interact with the project CDE?
print icon

Files and associated meta data can be imported both manually and automatically.

 

Manual - download the the meta data into a spreadsheet and associated files from the CDE, and then manually uploaded.

.

Automatic - meta data and files can be automatically collected using synchronization tools. These can monitor files in the CDE and set to update, without the need for manual intervention. The CDE administrator will need to grant security access. Contact us at [email protected] for further details.

 